Lagos, Nigeria – Nigeria’s commercial capital is set for its worst power crisis in years as a 25-day planned blackout kicks off, threatening to paralyze businesses, spike energy costs, and wipe out hundreds of billions in economic activity.
Why the Lights Are Going Out
Maintenance Work: TCN fixing Omotosho–Ikeja West 330 kV line
Duration: July 28 – August 21 (8 am–5 pm daily)
Affected Areas:
-
Entire Ikeja Electric coverage zone (most of Lagos)
-
Eko DisCo areas (Lagos Island, Agbara, parts of Ogun)
The Staggering Economic Toll
N13 trillion: Lagos’ monthly electricity spend (Official estimate)
Manufacturers: Forced to switch to diesel at 4x grid power cost
Hospitals/Hotels: Face N50M+/day extra generator expenses
DisCo Losses: Ikeja/Eko to forfeit N206B combined revenue
CEO of CPPE Warns:
“This isn’t just inconvenience – it’s a N500B body blow to Lagos’ economy. Businesses must choose between crippling energy costs or shutting down.”
Who Bears the Brunt?
SMEs: 60% lack backup power capacity
Banks: ATM networks may fail
Tech Hubs: Cloud services at risk
Cold Chain: Spoilage threat to food/pharma
The Silver Lining?
Grid Upgrade: First major maintenance in 8 years
Future Benefit: Could reduce 60% of current outages
TCN’s Pledge: “Short-term pain for long-term gain”
Why Lagos Can’t Afford This
-
Hosts 40% of Nigeria’s GDP
-
Accounts for 65% of industrial output
-
Handles 80% of maritime trade
Business Survival Tips:
-
Negotiate bulk diesel deals now
-
Shift operations to night shifts where possible
-
Leverage solar hybrids if available